26.06.2014
The service station OCW Oberscheider Car World GmbH in Lustenau is one of the busiest filling stations in the area.The area around the fuel pumps is subject to very heavy wear. Consequently special…
10.06.2014
Zecchinel's own filling station had an asphalt surface, which had to be replaced time and again due to heavy wear. The solution to reduce the high maintenance costs was to resurface the area…
03.06.2014
The de Neu-Bois tunnel consists of two parallel tunnels of two lanes each over a length of 941 m. It is part of the A16 Transjurane motorway between Boncourt and Bure. The dependable and durable…
20.05.2014
Roads and infrastructural facilities are subject to constant dynamic and meteorological stress. Safety-relevant aspects are becoming increasingly important, and consequently designated sections…
13.03.2014
This work was undertaken on behalf of the riot police headquarters in the German state of Hesse and completed in cooperation with Krabes building services company from Rödermark.
The 36…
25.11.2013
The bus depot of BV Mainzerverkehrsbetriebe showed some signs of damage to the cold asphalt. The many buses driving in and out every day constantly made it worse.The damaged sections were successfully…
16.07.2013
Asphalt surfacing on squares, roads, verges or parking bays is often colour-enhanced. Factors such as design, anti-skid properties and abrasion resistance play an important part in this context. Wecryl…