News

Congratulations to Great Britain!

Winner of the “LRWA Awards 2017”

10.11.2017

Now it's official: at the presentation of the "LRWA Awards 2017" of the "Liquid Roofing and Waterproofing Association" on 8 November, our colleagues in Great Britain were able to receive one of the coveted awards: they received the award in the category "Liquid Waterproofing Project of the Year"!

The…

ReferenceReport: Plunge Pool

Case Study Plunge Pool, Hayling Island, Portsmouth

28.02.2017

 

One of WestWood‘s first projects in the UK. Privately owened plunge poole needed some bespoke waterproofing. Due to the shape of the jacuzzi, it was an easy decision to use a liquid to fullfill the waterproofing…

ReferenceReport: Old House Tile Effect

Case Study Old House, Ardlingly Road, West Hoathy, Tile Effect

21.02.2017

 

This project was challenging due to the massive moisture content within the screed and the tile effect finish around the roof lights. Due to the complex finish, the project required the highest…

ReferenceReport: 32 Lincoln's Inn Fields

Case Study 32 Lincoln's Inn Fields, London, WC2A 3PH

14.02.2017

 

The existing structure had been leaking for the last three years causing considerable damage to the basement areas below. These basement rooms house a large computer suite and a communal area for the students.

ReferenceReport: Pall Mall Court

Case Study Pall Mall Court, King Street, Manchester

04.01.2017

The 525m2 of roof area on a Grade II Listed Buildingin King Street, Manchester. Read the full case study to find out why the fast curing property, which is only one of many, was the best choice for this particular project.

ReferenceReport: Bristol & West House

Brand New Case Study

11.11.2016

As this was a light well courtyard roof that is overlooked by five floors, the architect wanted something that was visually interesting and pleasing. Initially coloured gravel and rubber crumb had been mentioned,…

Still Cold Weather Installation Problems

Projects successfully installed during the colder winter months

04.11.2016

Rob Foley

Still worried about not being able to carry out your work  when the temperatures come tumbling down and the frost begins to bite? Here are some projects that have been successfully completed under…

ReferenceReport: Imperial West College

Brand New Case Study

28.10.2016

Main contractor Lang O’Rourke needed a robust waterproof system suitable for a loading bay that was to be used frequently. The system also needed to be a thin solution as a lack of threshold height was a concern.

Cold Weather Installation Problems

Solution: WestWood Wecryl PMMA

20.10.2016

Rob Foley

Worried about not being able to carry out your work during the colder months? Use our fast curing, flexible, hard wearing with unlimited compatibility, Wecryl PMMA product - available in a variety…

Rob Foley

Meet our new Regional Sales Manager

16.09.2016

Rob Foley

WestWood Liquid Technologies extends a huge and warm welcome to Rob Foley as our new Regional Sales Manager. Rob started with WestWood's in July and will be working alongside Paul Gibson covering the southern…

Mathew Holland

Mathew Holland Northern Regional Sales Manager

13.05.2016

Introducing Jackie Hughes

 We…

NFRC 2016 Roofing Awards

2016 Roofing Awards have creeped up quickly

11.05.2016

WestWood Liquid Technologies Limited are looking forward to this year Roofing Awards brought hosted by The National Federation of Roofing Contractors Limited.Last year, as you can…

Our Product in Action

Check out some of our YouTube Videos

05.04.2016

car park structure

Jemma Hageman

22.01.2016

Introducing Jemma Hageman

Christmas Shut down

Christmas Shut down - Office and Stock Movement Times

09.12.2015

  Christmas Shut down

 

Please note our offices will be closed from 1430 Friday 18th December and will reopen on 0800 Monday 4th January.   For Westwood products our order cut off time is 1200 Friday 18th December.…

Is your car park structure suffering?

Don't worry WestWood can help!

20.11.2015

car park structure

BBA - Zero Falls

Wecryl R 230 incl zero falls

05.11.2015

Product Summary

Product Summary

All Products in one place

23.10.2015

Product Summary

Product overview in one brochure. Simple…

Ken Russell

Meet our Field Technician

16.10.2015

Ken Russell

WestWood Liquid Technologies extends a huge and warm welcome to Ken Russell as our Field Technician. Ken started with WestWood's in September and will be working alongside Wayne Chissell whilst getting to know…

Christmas Shut Down

Summer Bank Holiday Office and Stock Movement Times

21.08.2015

Summer Bank Holiday Office and Stock Movement Times

Please note that our offices and any warehouse movements for stock are closed for the Spring Bank Holiday on Monday 31st August and will be reopening Tuesday 01st September as normal. We hope you all have a relaxing and fun long weekend with your…

Newsletter

We will send you regular e-mails
with news about WestWood
and our products.

Postal address

WestWood® Liquid Technologies Ltd.
31 Morris Road,
Nuffield Industrial Estate
Poole, Dorset BH17 0GG
United Kingdom

+44 800 808 5480
info@westwood-uk.com

Trade Association

  • LRWA
  • DIBt
  • NFRC
  • EOTA
  • BPA
  • BBA