Residential Complex



Dortmund- Mengede, Germany

Construction
September 2005
Construction Management
Severin, Warstein
Surface Area
ca. 132 m²
Substrate
Tiles, screed as well as plastics, metal

Brief Description

The first development stage involved refurbishing eleven balconies on the third floor of this residential complex. First of all extensive preparations had to be carried out. These included removing the wall cladding as well as an old PU coating and, in some areas, the old tiles. The total area of approx. 132 m² was permanently and securely waterproofed with the Wecryl waterproofing system, which features fleece reinforcement throughout. For an enhanced appearance the upstands on the vertical faces of the building were offset in dark grey.

Newsletter

We will send you regular e-mails
with news about WestWood
and our products.

Postal address

WestWood Liquid Technologies Ltd.
31 Morris Road,
Nuffield Industrial Estate
Poole, Dorset BH17 0GG
United Kingdom

+44 800 808 5480
info@westwood-uk.com

Trade Association

  • LRWA
  • DIBt
  • NFRC
  • EOTA
  • BPA
  • BBA