Hillington Square



Lynn, Norfolk, UK

Construction
November 2015
Construction Management
Proctor Roofing Ltd.
Surface Area
350 m²
Substrate
Asphalt & Timber

Brief Description

WestWood Liquid Technologies Wecryl Waterproofing System & Wecryl High Build System were successfully installed onto 350 m² of balconies and walkways to a residential complex in King‘s Lynn, Norfolk. WestWood Approved Contractor Proctor Roofing Ltd, cleaned and prepared the existing substrate. Then directly applied Wecryl 276 to the brickwork and Wecryl 222 Primer to the asphalt. To the timber balconies a fully reinforced Wecryl 230 Waterproofing Layer was added, whilst to the asphalt, Wecryl 230 thix was used on all upstands and areas of detailing. Once the Wecryl 233 Hard Wearing Layer and Quartz Sand had been installed, the project was nicely coated with a light grey Wecryl 288 finish. Both systems provided a thin, hard wearing, non-slip waterproof coating.

Newsletter

We will send you regular e-mails
with news about WestWood
and our products.

Postal address

WestWood Liquid Technologies Ltd.
31 Morris Road,
Nuffield Industrial Estate
Poole, Dorset BH17 0GG
United Kingdom

+44 800 808 5480
info@westwood-uk.com

Trade Association

  • LRWA
  • DIBt
  • NFRC
  • EOTA
  • BPA
  • BBA